220 kV
CompletedSurel Solar Park
- Client
- Torrent Power
- Voltage
- 220 kV
- Length
- 41.00 km
- Also
- 1 no. substation
Scope of work
EPC of 220 kV S/C line from Surel Solar Park to GETCO Bechraji substation, along with 1 no. substation.
Service
Evacuation lines, bays and switchyards connecting solar parks, wind farms, hybrid and small-hydro plants to the grid.
From solar parks to wind farms and small-hydro plants on canal networks, we connect generation to the grid — combining transmission lines, feeder bays and switchyards with the GETCO feasibility, approvals and clearances that grid connection requires.
Related projects
220 kV
CompletedEPC of 220 kV S/C line from Surel Solar Park to GETCO Bechraji substation, along with 1 no. substation.
220 kV
CompletedEPC of 132 kV D/C Shikarpur WF – Samakhiyali line at 220 kV Vondh S/S on 132 kV D/C & 220 kV M/C towers with ACSR Panther conductor and OPGW cable.
33 kV
CompletedEstablishment of 33 kV S/C transmission line (44 km) for the SECI V hybrid project.
400 kV
Completed220 kV S/C transmission line from the 105 MW ReNew solar plant to the 400 kV Charanka GETCO substation, and a 220 kV feeder bay at the 400 kV Charanka substation for the 105 MW solar power plant — both on turnkey basis.
400 kV
Completed400 kV remote-end switchyard for the 250 MW (100 MW + 150 MW) GUVNL solar plant.
132 kV
Completed132 kV BE electrical project under MPPTCL — civil and electrical works (solar plant).
Talk to our team about scope, approvals and execution — from GETCO feasibility through to final CEIG clearance.